Systems

Increasing and reducing letter of guaranty

In case of adding or increasing works of project, it requires increasing or raising the letter of guaranty 

related to the project, the letter of guaranty is selected to be raised then maximum of the process is 

shown by Babel or the minimum and to control the JV resulted from the raising or reducing process. 


Increasing and reducing letter of guaranty


Accounting guidance  for letter of guaranty